Friends of the Rubicon
FOTR |
||
|
|
|
Rubicon Trail Home Page Navigation -- SEARCH?
|
|||||||||
|
Friends of the Rubicon (FOTR) Accomplishments, Projects and Successes! * Completed Lahontan District Erosion Mitigation (2001 - FOTR, TNF, Placer County, Lahontan Water District) * Rerouted Loon Lake Connector away from Pleasant Lake/Meadow (2002 - FOTR, ENF, EDC) * Worked to control erosion at Gatekeeper with Boulders and Cement (2003 - FOTR, EDC) * Mitigated Walker Hill Erosion with log ramp (2003 - FOTR, EDC) * Performed Spider Lake Emergency Cleanup (2004 - FOTR) * Returned Miller Creek to Original Creek bed (2004 - FOTR, EDC) * Removed Logjam at Rubicon River Bridge (2004 - FOTR, EDC) * Worked to control erosion at Gatekeeper with Boulders and Cement (2003 - FOTR, EDC) * Spearheaded on-trail Traffic Survey (2005 - FOTR, EDC) * Assisted County contractors with Water Sampling (2005 - FOTR, EDC) * Finished drainage repairs to Gatekeeper after unannounced Agency Blasting (2006 - FOTR, EDC) * Drained Potato Patch Mud hole and planned Backfill with County (2006 - FOTR, Placer County) * Mitigated Erosion on top, middle, and bottom of Walker Hill (2006 - FOTR, EDC) * Restored and Reconstructed Log Bridge over seasonal drainage near base of Walker Hill (2006 - FOTR, EDC) * Reworked Wentworth Springs Road Drainage (2006 - FOTR, EDC) * Rock-Filled Potato Patch Mud hole with County (2007 - FOTR, Placer County) * Mitigated Erosion on top, middle, and bottom of Walker Hill (2007 - FOTR, EDC) * Used Range Fencing to block bypass through Private and Public Land near river (2007 - FOTR, EDC, ENF) * Massive Rock fill Project at Wentworth Springs with County (2007 - FOTR, EDC) * Reworked Water Bars and Drainage Near Devil’s Postpile (2007 - FOTR, EDC) This occurs all in addition to our outreach and education efforts: * Biannual Annual Law enforcement and VIP Tours * Biannual FOTR/Pirate4x4 cleanups * Weekend Rubicon Trail Patrol * Gatekeeper Information Handout |
|